Mining

Download An Introduction to Cut-Off Grade Estimation, Second Edition by Jean-Michel Rendu PDF

By Jean-Michel Rendu

ISBN-10: 0873353935

ISBN-13: 9780873353939

An advent to Cut-off Grade Estimation examines probably the most vital calculations within the mining undefined. Cut-off grades are necessary to picking the commercial feasibility and mine lifetime of a venture. Profitability and socioeconomic influence of mining operations are encouraged through the alternative of cut-off grades. Cut-off grades play a key function in estimating mineral reserves that may be publicly reported.

This new version is less complicated to learn and of higher useful curiosity to practitioners. the connection among optimization of web current worth, capability constraints, and chance price is defined in better aspect. a brand new part discusses mixing ideas, which play a severe position in more and more mining operations.

Author Jean-Michel Rendu, an the world over well-known specialist within the administration, estimation, and public reporting of mineral assets, offers functional insights. As a supervisor in significant mining businesses, a specialist, and an educator, Rendu has obtained substantial adventure in all points of mining engineering, adventure that was once integrated into this publication.

This is a must-read for mine managers, analysts, geologists, mining engineers, and public policymakers who are looking to remain at the innovative in their profession.

Show description

Read or Download An Introduction to Cut-Off Grade Estimation, Second Edition PDF

Best mining books

Fire and Brimstone: The North Butte Mining Disaster of 1917

The genuine tale of the worst hard-rock mining catastrophe in American history
The worst hard-rock mining catastrophe in American heritage started a part hour ahead of dead night on June eight, 1917, while fireplace broke out within the North Butte Mining Company's Granite Mountain shaft. Sparked greater than thousand ft lower than flooring, the fireplace spewed flames, smoke, and toxic fuel via a labyrinth of underground tunnels. inside an hour, greater than 400 males will be locked in a conflict to outlive. inside of 3 days, 100 and sixty-four of them will be dead.
Fire and Brimstone recounts the outstanding tales of either the lads lower than floor and their households above, targeting teams of miners who made the exceptional choice to entomb themselves to flee the gasoline. whereas the catastrophe is compelling in its personal correct, hearth and Brimstone additionally tells a miles broader story—striking in its modern relevance.
Butte, Montana, at the eve of the North Butte catastrophe, used to be a unstable jumble of antiwar protest, an abusive company grasp, seething exertions unrest, divisive ethnic rigidity, and radicalism either left and correct. It was once a powder keg missing just a spark, and the mine fireplace may ignite moves, homicide, ethnic and political witch hunts, profession by way of federal troops, and eventually a conflict over presidential strength.

Ores to Metals: The Rocky Mountain Smelting Industry (Timberline)

This complete remedy of the smelting of Colorado, initially released in 1979, is now again in print with a brand new preface by means of the writer. full of interesting information and mining facts, Ores to Metals info the folks, applied sciences, and company judgements that experience formed the smelting within the Rockies.

Management of Mineral Resources : Creating Value in the Mining Business

The mining industry's method for dealing with low profitability has targeted totally on controlling construction expenditures. regardless of mechanization, automation, and different technical advancements, the mixture profitability of mining nonetheless falls a long way in need of that discovered through so much different industries. writer Juan Camus contends that what's required isn't extra technical wisdom, yet quite sound administration practices that make the most of the present wisdom base extra productively.

Extra resources for An Introduction to Cut-Off Grade Estimation, Second Edition

Sample text

40 g/t if the recovery could be maintained at 65%. Laboratory tests confirmed that recovery was independent of grade, and the decision was made to lower the cut-off grade and add the lower-grade material to the pad. After two months of operation, managers realized that the gold production target for the year was not going to be met. If nothing changed, the amount of gold sold was going to be less than expected before the cut-off grade was decreased. Management immediately requested a review of the situation.

This calculation must be made on a discounted basis, taking all physical constraints into account. Optimization of Stope Size When designing a stope, one must take into account the constraints imposed by mining method and geotechnical conditions. One must also determine whether lower-grade material located along the boundary of the stope should be included in the stope. Such material should be mined only if the expected value of the recoverable product it contains exceeds all incremental costs, including mining, haulage, processing, backfilling, and other costs.

The loss is represented by the difference between the utility of the chosen process and that of the optimal process for the same average grade. Figure 3-13 shows the opportunity cost incurred per metric ton when a leach-mill cut-off grade of 5 g/t is used. Mathematical Formulation Let U1(x) be the utility of leaching one metric ton of material of grade x and U2(x) be the utility of milling the same metric ton. These utilities can be written as follows (in these equations the cost of sales R is included in V, and the overhead costs Oo are included in Mo, Po1, and Po2): U1 ( x ) = x ⋅ r1 ⋅ V − ( M o + Po1 ) U 2 ( x ) = x ⋅ r2 ⋅ V − ( Mo + Po2 ) The optimal cut-off grade is x c = ( Po1 − Po2 ) ( r1 − r2 ) V  Copyright © 2013 Society for Mining, Metallurgy, and Exploration, Inc.

Download PDF sample

Rated 4.62 of 5 – based on 11 votes